By SEBASTIÁN ENCINA, Collections Manager
In the coming months, the Kelsey Museum is going to be seeing some changes to our neighborhood. The new Trotter Multicultural building as well as the expansion of LSA for their Opportunity Hub will both be commencing shortly. Normally, any construction is nerve-wracking for museums, as vibrations can cause deterioration to artifacts. With this activity being so close to the Kelsey, we will be seeing even more potential movement in the galleries and storage. Throw on top of all this the fact that there will be construction on two fronts, so vibrations will be steady and ongoing for a long period of time.
Small and big vibrations will cause artifacts to move, but the shaking can cause flaking and other breaking to occur. If you wander the galleries and see something amiss, please inform security or notify museum staff if they are in the galleries at the time. Fortunately, the Kelsey is staffed by high caliber professionals who are already on top of this, and have a plan to mitigate the situation. Thanks to them, we expect to see no damage during this construction period.
For this month’s “From the Archives,” we look back when the opposite situation was taking place. Back in 2007, the Kelsey was undergoing its own construction. This project affected our neighbors, the students living in Newberry and Barbour Residences, as well as our colleagues in LSA. For the Kelsey, this was a long time coming, as calls for a new building for the collections had been written decades before. Finally, in 2009, the doors at the William E. Upjohn Exhibit Wing opened to the public, the culmination of several years’ worth of work.
Those who have been with the Kelsey Museum for a long time will remember that the space where Upjohn is now was a parking lot. About 20–25 cars could fit here, often for staff of the residences and the Kelsey. Much to the chagrin of several people who enjoyed parking close to work, the lot was removed and the new wing went up instead.
Images shared here show the construction at different phases. While construction was underway, Collections Manager Sebastián Encina went around photographing the progress from various angles, including the roof of LSA, the Student Activities Building, the former Kelsey archives room, even street views. We are now fortunate to have this collection of images that encapsulate a portion of our own history. It reminds us how much work goes into the planning and actualization of a construction project. At the time, it was difficult to imagine what the end result was going to look like. Now, ten years later, we have a whole history in this building already, many stories shared, many names and voices passing through.